Work on the BKSTONE project is proceeding with undiminished intensity in the third and final year of the project. Although pandemic conditions prevailed, on December 2nd and 3rd, 2021. the 4th main meeting of all partners and project coordinators was held in person at the University of Sarajevo, as well as an analysis of the work done so far, deadlines for completion of teaching and promotional materials, and specific dates for teacher and student education.
Before the meeting in Sarajevo, an online meeting was held on November 23rd, 2021., at which the Partners agreed on the method of making materials by modules.
After meeting in Sarajevo, an online meeting was held on Friday, January 14th, 2022., where among other things, promotional material about the project was presented.
The next online meeting was scheduled again on Friday, January 21st, 2022.
Online meeting on November 23rd 2021.
Meeting of the Coordinators and all partners of the BKSTONE project
on December 2nd and 3rd, 2021. in Sarajevo
Online meeting on January 14th, 2022.
Equipment from the BKSTONE project at the University of Mostar
https://fgag.sum.ba/Documents/Godisnjak_2021.pdf
Lab exercises with students with BKSTONE equipments
https://www.instagram.com/p/CVlCJReMXCo/?utm_medium=copy_link
https://fgag.sum.ba/Documents/Godisnjak_2021.pdf
Presentation of the BKSTONE project at the Ceremonial Promotion 17.12. 2021. at FGAG SUM
https://fgag.sum.ba/hidden-with-slideshow/1590-svecana-promocija-2021-2
Promotion of the BKSTONE project: Yearbook 2021, pp. 67, 68 and 87.
https://fgag.sum.ba/Documents/Godisnjak_2021.pdf